Circular UAV Week 6 and 7 Winter Quarter ( Revised)

zzou1 2015-2016 Circular UAV

For the past two weeks, our circular UAV team has 1) Finished the CNC milling of the wing bodies after failing numerous times. 2) Designed the frame and CAD for the carbon tube connectors. 3) 3D printed the prototype motor mount and frame connectors. 4) Received the carbon tubes for the frame structure. 5) Presented for peer review. For the …

Week 8 – Fuel Cell Data Center Blog

gcobos 2015-2016, 2015-2016 Fuel Cell Data Center

This week we collected data for our presentation to the industry representatives on March 11th. We have started work on our current goal of making a poster for the winter design review in the mechanical/aerospace department and civil/environmental department. Two of our members from environmental engineering have also began making the presentation relevant for them. All of our purchase orders …

UCI EDI: Automated Pipetting Robot

UCI Automated Pipetting Robot 2015-2016, 2015-2016 Automated Pipetting Robot, Project Achievements

This blog is devoted to documenting the progress of our MAE188 Automated Pipetting Robot project. Advised by Professor Farzad Akhmadkhanlou and Professor Vince McDonnell, and sponsored by Professor Tony Long, the goal of this project is to develop a robot that can efficiently move an array of 24 pipettes in order to transfer fluids, which will facilitate Professor Long’s research …

Circular UAV Week 6 and 7 Winter Quarter

zzou1 2015-2016 Circular UAV

For the past two weeks, our circular UAV team has 1) Finished the CNC milling of the wing bodies after failing for numerous times. 2) Designed te frame and CAD the carbon tube connectors. 3) 3D printed the prototype motor mount and frame connectors. 4) Received the carbon tubes for framing the body. 5) Peer reviewed. For the next week, …

Week 7 – Fuel Cell Data Center Blog

gcobos 2015-2016, 2015-2016 Fuel Cell Data Center, Project Achievements, Project Learning

Our biggest accomplishment this week was that our team came in 5th place out of the 26 teams that participated for the winter peer review. Because we placed in the top 7, we were invited to present to industry representatives on March 11th. This quarter our team was more prepared due to the constructive criticism we received from the fall …

Week 6 – Fuel Cell Data Center Blog

gcobos 2015-2016, 2015-2016 Fuel Cell Data Center, Events, Project Learning, Project Achievements

This week we prepared for the Quarterly Peer Review. It was very nice to have our advisor attend and support us as we presented. Mike did a great job putting together everyone’s presentation materials and leading the presentation. We sent out the purchase orders for some parts we needed to fix the cooling system, and we received them this week. …