- Team Formation and Contract
- Introduction
- Team Name
- Team Goal
- Organizational (Org) Chart
- Identify Support Structure and Available Resources
- Team Communication Plan
- Team Contract
- Signatures
- Project Discovery
- Background (external driving factors and context)
- Problem Statement (clarify the need)
- Updated Project Goal Statement
- Requirements (measurable)
- Generation of Engineering Concepts (delivering things that meet requirements)
- Analysis (calculations, simulations, project risks)
- Testing (mini-experiments)
- Concept Review/Selection
- Final Design Specification
- Project Design for Safety
- Safety Concerns
- Breakdown of Design Concepts
- Preliminary List of Training Requirements
- Summary
- Product Specifications
- System Breakdown (into assemblies and components)
- Project Schedule (tasks, objectives, milestones)
- Design Drawings (assemblies and components)
- Analysis (verification of requirements and design review)
- Generate the Bill of Materials (BOM)
- Manufacturing Plan (make or buy)
- Realization: Manufacturing and Assembly
- Health and Safety
- Cost Analysis and Purchasing Plan
- Fabrication/Assembly and Verification
- Tooling, Assembly Fixture, and Test Apparatus Fabrication
- Failure Modes and Effects Analysis
- Selective Component Testing Plans
- Requirements Update and Drawing Revisions
- Project Safety Plan
- List of Hazardous Materials Involved
- Equipment and Experimental Apparatus
- Personal Protective Equipment (PPE)
- Training Requirements
- Member Training
- Operational Procedures
- Public Safety
- Project Testing and Validation
- Testing Approach
- Resource Requirements
- Test Environment
- Test Responsibilities
- Test Details
- Test Results
- Validation Summary
- Project Closure
- Description
- Scope Statement
- Accomplishments
- Financial Summary
- Inventory and Records
- Lessons Learned and Recommendations
- Team Lead(s) Comments
- Appendix A: Team Members