For the past week, our Circular UAV team
1)Started the CAD model
2)Prepared for the peer review presentation.
3)Fixed the power requirement and the motor size.
We focused on calculation and studying for midterms this week. Next week, we are going to start the poster for Fall Design Review and have the peer review presentation.