Week 2 and 3 – The balloons and wing frame update

jundongh 2015-2016, 2015-2016 Aerial Wind Turbine

For these past few weeks the structural team has begun to place the finishing touch on the design of the interior frame. The importance of these last two weeks was to optimize the structural integrity of frame such that it is as light as possible while also being as sturdy and as strong as possible. They have also begun to order material for the frames as well. We will start manufacturing when the materials arrive.