Circular UAV Week 8,9,10 Winter Quarter

zzou1 2015-2016 Circular UAV

For the past few weeks, our team

1) Finished the carbon frame structure for the wing body.
2) Put together the foam wing bodies that we fabricated.
3) Cut out channels on the prototype wing body for the frame.
4) Assembled the final body of the prototype with the airframe.
5) Finished the CAD model and poster for winter design review.

For the upcoming weeks, our team is going to coat the wing body with fiberglass, and start working on the control surfaces.